235

Discipline/Origin

Drilling
No origin

Well

Grosbeak West
35/11-21 S

Date created

2020/06/16
2000 days ago

Project Phase

Operational
Project Phase

LL Type/Classification

Operational
Negative

Transocean Arctic


What happened in Reservoir section:
Dropped 2 15/16″ drift to check 5 1/2″ DP/HWDP prior to coring (coring ball 1 1/4″). The drift was recovered, as expected, in XO between 6 1/2″ DC and 5 1/2″ HWDP. Therefore, had to drift 4 x DC stands in derrick before M/U coring BHA.

What Was Planned

Drift drillstring prior to coring.

What Was Learned

Could be beneficial to put a Totco ring on top of SLB BHA ( below 6 1/2″ DC) and drop a 2″ drift.

What Actions Are Required

Evaluate procedure.